ball mill installation

to install the ball mill correctly

to install the ball mill correctly

The installation quality of the ball mill is the key to ensure the normal operation of the mill. The installation methods and order of various types of ball mills are approximately the same. In order to ensure the smooth operation of the ball mill and reduce the harm to the building, it must be installed on the reinforced concrete foundation of 2.5-3 times as much as its weight and it should be far away from factory building foundation 40-50 mm. In order to ensure that the position accuracy of the ball mill components is not changed greatly, the base of the ball mill should adopt the whole block structure.

A ball mill can be installed on top of the concrete base when its compressive strength is up to more than 75%. Before installation, check the quality of the basis to ensure that concrete is not affected by the strength of the defect, the number and position of the reserved hole meets the requirements, and the reserved holes have no water, without oil stain. When the operator installs the machine with "ground wire" method, he should bury the "central board" in the foundation in advance. Draw all center lines before the installation and make a bold mark on the center board as the centerline reference for installation. Next is the following specific installation steps.

A. The main bearing should be installed when the ball mill is installed. To avoid the wear of hollow shaft neck and bearing liner, the elevation difference of the base plate of the two main bearings shall not exceed 0.25 millimeters per meter length.

B. When people install the mill cylinder body, it can be installed in the forms of all the pre-assembled cylinder body part directly or be divided into several parts. And the centerline of the shaft neck and ball mill should be checked and adjusted. The concentric error must be less than 0.25 mm per meter.

C. Install the transmission parts (pinion, shaft, coupling, decelerator, electromotor, etc.). During installation, the measurement and adjustment should be done according to product technical standards. Check the radial swing difference of gear ring, the meshing performance of pinion and concentricity of decelerator and pinion. When all the installation meets the requirements, the foundation bolts and the main bearing soleplate can be watered.

Of course, for the foundation design and installation of ball mill, you also should to refer to the general assembly drawing and basic drawing of ball mill. Yuhong Heavy Machinery Co., Ltd., Zhengzhou City, Chinais a professional mining equipment manufacturer integrating production, research and development, sales and export of products, mainly including drying machine, crusher, Rotary kiln, mill. For further inquiry, please contact us soon.

4 installation steps, 10 requirements and medium selection of ball mill | fote machinery

4 installation steps, 10 requirements and medium selection of ball mill | fote machinery

Ball mill installation is a must step before it is put into production, which will affect the subsequent use of the ball mill, and even affect the production volume, crushing rate, service life, etc., so the importance of ball mill installation is self-evident.

In addition, the choice of grinding medium is also crucial. In the grinding process, different grinding medium can be used for different materials, models and equipment, which can reduce production costs and improve production efficiency.

There are four chassis should be installed: the front tile base, the rear tile base, the motor chassis and the reducer chassis. During the installation of the chassis, the horizontality and horizontal elevation of the chassis must be checked by a level or level gauge and a steel rule.

At the same time, the width of these wedges should be between 50 and 60 mm; the length should be at least ensured to exceed the centerline of the anchor bolts inside the chassis, and the outside should be exposed to a length of 10 to 50 mm; the slope of the wedge should be between 1:10 and 1:20.

If the actual combined size between the motor cylinder and the hollow shaft is inconsistent with the technical documents of the equipment or the relevant design, the construction may be carried out according to the actual size after obtaining the consent of the relevant unit personnel.

The transverse centerlines of the two main bearing chassis must coincide and allow for a combined error of no more than 0.5 mm. The non-horizontal degree of the main bearing chassis is allowed to differ by 0.1 mm/m, and the error of the non-parallelism is 0.5 mm/m, but the ball mill must be ensured to discharge materials.

Before the installation of the spherical surface of the main bearing, it is necessary to carefully check whether there are blisters, pores, cracks and other defects on the babbitt surface and the spherical surface, and there is no possibility of shrinking the shell in the interval between the hollow shaft and the contact surface of the bushing. phenomenon.

Firstly, before assembling the cylinder and the end cap, check the cylinder to ensure that the ellipse of the cylinder is not larger than 4 of the diameter of the cylinder. And meanwhile, the ovality and surface smoothness of the hollow journal should also be checked.

After the end cap and the cylinder bolt hole are aligned with the positioning pin, put a 1/4 number of bolts and tighten by hand, one-third of which are half tightened, and the concentricity is adjusted within 0.25mm, and then tightened.

Next, the cylinder and end cap assembly are transferred into the main bearing, but the housing must be adjusted to meet the requirements before the cylinder and end cap assembly are installed in the main bearing.

After assembling, the assembled cylinder should be measured and the total length and the length of the center of the two journals are compared with the center distance of the bearing housing to make sure they match with each other, otherwise, the bearing housing or the position of the main base need to be adjusted.

The inner surface of the ball mill cylinder is generally equipped with liners of various shapes that are the main wearing parts of the ball mill, and whose cost is about 2%-3% of the price of the whole product.

Thus, the performance and service life of the lining plate are issues that users are very concerned about, for its performance will directly affect the performance of the ball mill. The following are the 10 requirements for the liner installation.

The greater the density of the grinding medium is, the shorter the grinding time is. In order to increase the grinding effect, the hardness of the grinding medium must be greater than the hardness of the material to be ground.

According to long-term experience, the Mohs hardness of the medium is preferably greater than the hardness of the material to be ground by more than three grades. In addition, the smaller the size of the grinding medium is, the more the contact points it will be.

The loading amount has a direct influence on the grinding efficiency, and the particle size of the grinding medium determines the loading amount of the grinding medium. It must be ensured that when the grinding medium moves in the disperser, the porosity of the medium is not less than 40%.

For different fineness requirements, it is necessary to adjust the ability of the grinding medium to break and grind. The filling rate is high and the grinding ability is strong. On the contrary, the crushing ability is weak. When super fine grinding, the high filling rate is generally adopted.

Grinding medium generally is spherical because other irregularly shaped medium can wear themselves and cause unnecessary contamination. The size of the medium directly affects the grinding efficiency and product fineness.

The larger the diameter is, the larger the product size and the yield are. Conversely, the smaller the particle size is, the smaller the particle size and the the yield are. In actual production, it is generally determined by the feed size and the required product fineness.

Generally speaking, in the continuous grinding process, the size of the grinding medium is distributed regularly. The medium size ratio is directly related to whether the grinding ability can be exerted and how to reduce the wear of the medium.

In the process, it will not always maintain at a fixed medium ratio. So, the method of replenishing large balls is used to restore the grinding of the system. It is difficult for the mill to maintain at a fixed medium ratio for a long time.

In the production process, it is necessary to explore the appropriate ratio according to the type of material and the characteristics of the process, and remove the too small medium in time to reduce the cost.

The wear resistance and chemical stability of the grinding medium are important conditions for measuring the quality of the grinding medium. The non-wearing media needs to be supplemented by the need of abrasion, which not only increases the cost, but more importantly affects the production.

As common grinding equipment, ball mills are widely used in power, chemical, mining, cement and other processing sectors. At present, there are many kinds of ball mills popular in the market, with various functions and different prices.

Therefore, enterprises often face a dazzling situation when purchasing. Generally, when selecting a ball mill, the company must combine the material properties, abrasive requirements, production environment, energy consumption and other factors through scientifically comparing to select the ball mill that is most suitable for its use requirements.

As a leading mining machinery manufacturer and exporter in China, we are always here to provide you with high quality products and better services. Welcome to contact us through one of the following ways or visit our company and factories.

Based on the high quality and complete after-sales service, our products have been exported to more than 120 countries and regions. Fote Machinery has been the choice of more than 200,000 customers.

the attentions of ball mill grinder installation and commission - xinhai

the attentions of ball mill grinder installation and commission - xinhai

Ball mill grinder is the essential equipment in mineral processing plant, which is also the key equipment in the whole mineral processing plant construction. Therefore the stable operation of ball mill is essential. However, before the official putting into operation, the commission of ball mill grinders is important. A little mistake would lead to the unqualified particle size in products, even reducing the metal recovery rate. How to carry out the commission of ball mill grinders? In this passage, we will introduce you to the process of ball mill grinder commission.

Ball mill grinder installation accomplishment according to the paper, to ensure all the components are at the right position. The complete installation process should be recorded and acceptance passed.

The bush should be installed on the sector block of lower bearing seat according to the rotation direction of ball mill. The bush should be revised according to the axial guide ring. The bearing seat seal should be installed correctly. The junction should be sealed by a sealant.

Ensuring that all the monitoring equipment are well-connected. The flow monitor, pressure switch and temperature sensor are set well. Oil pressure gauge, thermometer, accident button and interlocking device instructions are reliable.

Connecting with reducer and pinion coupling, and installing protecting mask. Start the lubricating oil system and cooling water system. Turn on the power of the ball mill, press the accident button to stop it, and check the main bearing, motor, and gears to determine whether the direction of rotation of the ball mill is correct. If there is no abnormality, start the ball mill to run for 8 hours.

When running empty, if the lubricating oil system is working normally and there is no oil leakage. The ball mill runs smoothly and there is no obvious noise. The vibration value of the main bearing, motor, and pinion does not exceed 0.1mm, and there is no obvious damage or hot phenomenon to all parts. The empty vehicle runs normally.

According to the ratio of ball mill, a certain amount of steel balls are added into the cylinder of ball mill grinder. Steel balls are added in batches. During operation, measure bearing temperature, current, and vibration intensity everywhere. After the installation of the ball mill is completed, start to run with load, add 70% of the specified load into the grinding material, and continue to run for more than 10 hours. During this process, the liner bolt joint should be fastened and check the bolt connection frequently to prevent the loosen.

During running with load, the ball mill grinder should satisfy the following requirements. The vibration of each part does not exceed 0.1mm; The current of the motor has no abnormal fluctuations; The running process is stable; The noise is small; The connecting bolts are tight, and the cylinder has good sealing.

The above is the whole installation and commission process of ball mill grinder. Xinhai Mining established the commission operation management service center to ensure the correct and favourable installation. Xinhai Mining insists on the service idea professional attitude wins the trusts of clients, helping clients to resolve problems and free from worries.

ball mill,ball mill installation instructions

ball mill,ball mill installation instructions

Ball mill is a widely used industry on Portland. Strong aircraft adaptable for most solid materials can be finely ground; Simple structure, easy to operate, can accurately control the fineness of the material, and easy maintenance repair picking.

Generally speaking, the direct way to improve mill output has three kinds: 1. Prior to setting mill crushing machine; 2. Improved ball mill grinding system to improve grinding efficiency; 3. Plus home efficient classifier.

Minted ball mill steel balls is steel, iron and other electric furnace heated up charge use to make the charge sufficiently melted, add the amount of precious metal alloys to charge the melting furnace in the process of chemical ingredients quenched until the hot metal temperature above 1550 and meet the technical requirements after passing the molten iron is poured into molds or ball production line ball mold. Which is manufactured by casting melting approach is called casting ball out of the ball.

Forged ball mill steel balls is heated to high temperatures by direct approach to manufacturing forged and then take out the ball, it does not require melting and casting, forging so called just after forging steel balls. Forged steel ball chromium content between 0.1% to 0.5%, the carbon content of 1.0% or less.

planetary ball mill installation installation introduction - news - changsha deco equipment co.,ltd

planetary ball mill installation installation introduction - news - changsha deco equipment co.,ltd

Planetary ball mills are equipped with four ball mill tanks. The principle of ball mill tanks is to perform self-rotation on the orbit. When the ball milling jar is in motion, it can make a 360-degree turn in the space of the three-dimensional range, and it can run at any fixed point to achieve the grinding principle.

The balls and material of the ball mill tank should have the same weight to achieve stable operation, improve the grinding efficiency, and reduce the vibration of the ball mill. Two ball mill jar grinding experiments can also be used when there is insufficient material. The load should be 3/2 of the volume of the ball mill tank, and the remaining space is convenient for grinding operation. When the material overflows the ball grinding tank tank, the operation speed is too high. The grinding speed should be adjusted to improve the grinding efficiency.

ball mill maintenance & installation procedure

ball mill maintenance & installation procedure

Am sure your BallMill is considered the finest possible grinding mill available. As such you will find it is designed and constructed according to heavy duty specifications. It is designed along sound engineering principles with quality workmanship and materials used in the construction of the component parts. YourBallMill reflects years of advancement in grinding principles, materials, and manufacturing techniques. It has been designed with both the operators and the erectors viewpoints in mind. Long uninterrupted performance can be expected from it if the instructions covering installation and maintenance of the mill are carried out. You may be familiar with installing mills of other designs and manufacture much lighter in construction. YourBallis heavy and rugged. It should, therefore, be treated accordingly with due respect for its heavier construction.

The purpose of this manual is to assist you in the proper installation and to acquaint you a bit further with the assembly and care of this equipment. We suggest that these instructions be read carefully and reviewed by everyone whenever involved in the actual installation and operation of the mill. In reading these general instructions, you may at times feel that they cover items which are elementary and perhaps not worthy of mention; however in studying hundreds of installations, it has been found that very often minor points are overlooked due to pressure being exerted by outside influences to get the job done in a hurry. The erection phase of this mill is actually no place to attempt cost savings by taking short cuts, or by-passing some of the work. A good installation will pay dividends for many years to come by reduced maintenance cost.With the modern practice of specialized skills and trades, there is often a line drawn between responsibilities of one crew of erectors and another. Actually the responsibility of installation does not cease with the completion of one phase nor does it begin with the starting of another. Perhaps a simple rule to adopt would be DO NOT TAKE ANYTHING FOR GRANTED. This policy of rechecking previously done work will help guarantee each step of the erection and it will carefully coordinate and tie it into subsequent erection work. To clarify or illustrate this point, take the example of concrete workers completing their job and turning it over to the machinist or millwright. The latter group should carefully check the foundation for soundness and correctness prior to starting their work.

Sound planning and good judgement will, to a great extent, be instrumental in avoiding many of the troublesome occurrences especially at the beginning of operations. While it is virtually impossible to anticipate every eventuality, nevertheless it is the intention of this manual to outline a general procedure to follow in erecting the mill, and at the same time, point out some of the pitfalls which should be avoided.

Before starting the erection of the mill, adequate handling facilities should be provided or made available, bearing in mind the weights and proportions of the various parts and sub-assemblies. This information can be ascertained from the drawings and shipping papers.

The gearing, bearings, and other machined surfaces have been coated with a protective compound, and should be cleaned thoroughly with a solvent, such as Chlorothene, (made by Dow Chemical). Judgement should be exercised as to the correct time and place for cleaning the various parts. Do not permit solvents, oil or grease to come in contact with the roughened top surfaces of the concrete foundation where grouting is to be applied; otherwise proper bonding will not result.

After cleaning the various parts, the gear and pinion teeth, trunnion journals and bearings, shafting and such, should be protected against rusting or pitting as well as against damage from falling objects or weld splatter. All burrs should be carefully removed by filing or honing.

Unless otherwise arranged for, the mill has been completely assembled in our shop. Before dismantling, the closely fitted parts were match marked, and it will greatly facilitate field assembly to adhere to these match marks.

The surfaces of all connecting joints or fits, such as shell and head flanges, trunnion flanges, trunnion liner and feeder connecting joints, should be coated with a NON-SETTING elastic compound, such as Quigley O-Seal, or Permatex to insure against leakage and to assist in drawing them up tight. DO NOT USE WHITE LEAD OR GREASE.

Parts which are affected by the hand of the mill are easily identified by referring to the parts list. In general they include the feeder, feed trunnion liner, discharge trunnion liner if it is equipped with a spiral, spiral type helical splitter, and in some cases the pan liners when they are of the spiral type. When both right and left hand mills are being assembled, it is imperative that these parts which involve hand be assembled in the correct mill.

Adequate foundations for any heavy equipment, and in particular grinding mills, are extremely important to assure proper operation. The foundation should preferably be in one piece, that is, with a reinforced slab footing (so called mat) extending under both trunnion bearing foundations as well as the pinion bearing foundation. If possible or practical, it should be extended to include also the motor and drive. With this design, in the event of some movement, the mill and foundation will tend to move as a unit. ANY SLIGHT SETTLING OF FOUNDATIONS WILL CAUSE BEARING AND GEAR MISALIGNMENT, resulting in excessive wear and higher maintenance costs. It has been found that concrete foundations on a weight basis should be at least 1 times the total weight of the grinding mill with its grinding media.

Allowable bearing pressure between concrete footings and the soil upon which the foundation rests should first be considered. The center of pressure must always pass through the center of the footing. Foundations subject to shock should be designed with less unit pressure than foundations for stationary loads. High moisture content in soils reduces the amount of allowable specific pressure that the ground can support. The following figures may be used for preliminary foundation calculations.

Portland cement mixed with sand and aggregate in the proper proportions has come to be standard practice in making concrete. For general reference cement is usually shipped in sacks containing one cubic foot of material. A barrel usually holds 4 cubic feet. Cement will deteriorate with age and will quickly absorb moisture so it should be stored in a dry place. For best results the sand and gravel used should be carefully cleaned free of humus, clay, vegetal matter, etc.

Concrete may be made up in different mixtures having different proportions of sand and aggregate. These are expressed in parts for example a 1:2:4 mixture indicates one bag of cement, 2 cubic feet of sand, and 4 cubic feet of gravel. We recommend a mixture of 1:2:3 for ball mill and rod mill foundations. The proper water to sand ratio should be carefully regulated since excess water increases the shrinkage in the concrete and lends to weaken it even more than a corresponding increase in the aggregate. Between 5 to 8 gallons of water to a sack of cement is usually recommended, the lower amount to be used where higher strength is required or where the concrete will be subject to severe weathering conditions.

Detailed dimensions for the concrete foundation are covered by the foundation plan drawing submitted separately. The drawing also carries special instructions as to the allowance for grouting, steel reinforcements, pier batter, foundation bolts and pipes. During concrete work, care should be taken to prevent concrete entering the pipes, surrounding the foundations bolts, which would limit the positioning of the bolts when erecting the various assemblies. Forms should be adequately constructed and reinforced to prevent swell, particularly where clearance is critical such as at the drive end where the gear should clear the trunnion bearing and pinion bearing piers.

For convenience in maintenance, the mill foundations should be equipped with jacking piers. These will allow the lifting of one end of the mill by use of jacks in the event maintenance must be carried out under these conditions.

Adequate foundations for any heavy equipment, and in particular Marcy grinding mills, are extremely important to assure proper operation of that equipment. Any slight settling of foundations will cause bearing and gear misalignment, resulting in excessive wear and higher maintenance costs. It has been found that concrete foundations on a weight basis should be approximately 1 times the total weight of the grinding mill with its grinding media.

Allowable bearing pressure between concrete footings and the soil upon which the foundation rests should first be considered. The center of pressure must always pass through the center of the footing. Foundations subject to shock should be designed with less unit pressures than foundations for stationary loads. High moisture content in soils reduces the amount of allowable pressure that that material can support. The following figures may be used for quick foundation calculations:

Portland cement mixed with sand and aggregate in the proper proportions has come to be standard practice in making concrete. For general reference cement is usually shipped in sacks containing one cubic foot of material. A barrel usually consists of 4 cubic feet. Cement will deteriorate with age and will quickly absorb moisture so it should be stored in a cool, dry place. The sand and gravel used should be carefully cleaned for best results to be sure of minimizing the amount of sedimentation in that material.

Concrete may be made up in different mixtures having different proportions of sand and aggregate. These are expressed in parts for example a 1:2:4 mixture indicates one bag of cement, 2 cubic feet of sand, and 4 cubic feet of gravel. We recommend a mixture of 1:2:3 for ball mill and rod mill foundations. The proper water to sand ratio should be carefully regulated since excess water will tend to weaken the concrete even more than corresponding variations in other material ratios. Between 5 to 8 gallons of water to a sack of cement is usually recommended, the lower amount to be used where higher strength is required or where the concrete will be subject to severe weathering conditions.

We recommend the use of a non-shrinking grout, and preferably of the pre-mixed type, such as Embeco, made by the Master Builders Company of Cleveland, Ohio. Thoroughly clean the top surfaces of the concrete piers, and comply with the instructions of the grouting supplier.

1. Establish vertical and horizontal centerline of mill and pinion shaftagainst the effects of this, we recommend that the trunnion bearing sole plate be crowned so as to be higher at the center line of the mill. This is done by using a higher shim at the center than at the endsand tightening the foundation bolts of both ends.

After all shimming is completed, the sole plate and bases should be grouted in position. Grouting should be well tamped and should completely fill the underside of the sole plate and bases. DO NOT REMOVE THE SHIMS AFTER OR DURING GROUTING. When the grout has hardened sufficiently it is advisable to paint the top surfaces of the concrete so as to protect it against disintegration due to the absorption of oil or grease.

If it is felt that sufficient accuracy in level between trunnion bearing piers cannot be maintained, we recommend that the grouting of the sole plate under the trunnion bearing opposite the gear end be delayed until after the mill is in place. In this way, the adjustment by shimming at this end can be made later to correct for any errors in elevation. Depending on local climatic conditions, two to seven days should he allowed for the grouting to dry and set, before painting or applying further loads to the piers.

Pinion bearings are provided of either the sleeve type or anti-friction type. Twin bearing construction may use either individual sole plates or a cast common sole plate. The unit with a common sole plate is completely assembled in our shop and is ready for installation. Normal inspection and cleaning procedure should be followed. Refer to the parts list for general assembly. These units are to be permanently grouted in position and, therefore, care should be taken to assure correct alignment.

The trunnion bearing assemblies can now be mounted on their sole plates. If the bearings are of the swivel type, a heavy industrial water-proof grease should be applied to the spherical surfaces of both the swivels and the bases. Move the trunnion bearings to their approximate position by adjustment of the set screws provided for this purpose.

In the case of ball mills, all internal wearing parts will pass through the manhole, whereas in the case of open end rod mills they will pass through the discharge trunnion opening. When lining the shell, start with the odd shaped pieces around the manhole opening if manholes are furnished. Rubber shell liner backing should be used with all cast type rod mills shell liners. If the shell liners are of the step type, they should be assembled with the thin portion, or toe, as the leading edge with respect to rotation of the mill.

Lorain liners for the shell are provided with special round head bolts, with a waterproof washer and nut. All other cast type liners for the head and shell are provided with oval head bolts with a cut washer and nuts. Except when water proof washers are used, it is advisable to wrap four or five turns of candle wicking around the shank of the bolt under the cut washer. Dip the candle wicking in white lead. All liner bolt threads should be dipped in graphite and oil before assembly. All liner bolt cuts should be firmly tightened by use of a pipe extension on a wrench, or better yet, by use of a torque wrench. The bolt heads should be driven firmly into the bolt holes with a hammer.

In order to minimise the effect of pulp race, we recommend that the spaces between the ends of the shell liners and the head liners or grates be filled with suitable packing. This packing may be in the form of rubber belting, hose, rope or wood.

If adequate overhead crane facilities are available, the heads can be assembled to the shell with the flange connecting bolts drawn tightly. Furthermore, the liners can be in place, as stated above, and the gear can be mounted, as covered by separate instructions. Then the mill can be taken to its location and set in place in the trunnion bearings.

If on the other hand the handling facilities are limited it is recommended that the bare shell and heads be assembled together in a slightly higher position than normal. After the flange bolts are tightened, the mill proper should be lowered into position. Other intermediate methods may be used, depending on local conditions.

In any event, just prior to the lowering of the mill into the bearings the trunnion journal and bushing and bases should be thoroughly cleaned and greased. Care should be taken not to foul the teeth in the gear or pinion. Trunnion bearing caps should be immediately installed, although not necessarily tightened, to prevent dirt settling on the trunnions. The gear should be at least tentatively covered for protection.

IMPORTANT. Unless the millwright or operator is familiar with this type of seal, there is a tendency to assume that the oil seal is too long because of its appearance when held firmly around the trunnion. It is not the function of the brass oil seal band to provide tension for effective sealing. This is accomplished by the garter spring which is provided with the oil seal.

Assemble the oil seal with the spring in place, and with the split at the top. Encircle the oil seal with the band, keeping the blocks on the side of the bearing at or near the horizontal center line so that when in place they will fit between the two dowel pins on the bearing, which are used to prevent rotation of the seal.

Moderately tighten up the cap screws at the blocks, pulling them together to thus hold the seal with its spring in place. If the blocks cannot be pulled snuggly together, then the oil seal may be cut accordingly. Oil the trunnion surface and slide the entire seal assembly back into place against the shoulder of the bearing and finish tightening. Install the retainer ring and splash ring as shown.

In most cases the trunnion liners are already mounted in the trunnions of the mills. If not, they should be assembled with attention being given to match marks or in some cases to dowel pins which are used to locate the trunnion liners in their proper relation to other parts.

If a scoop feeder, combination drum scoop feeder or drum feeder is supplied with the mill, it should be mounted on the extended flange of the feed trunnion liner, matching the dowel pin with its respective hole. The dowel pin arrangement is provided only where there is a spiral in the feed trunnion liner. This matching is important as it fixes the relationship between the discharge from the scoop and the internal spiral of the trunnion liner. Tighten the bolts attaching the feeder to the trunnion liner evenly, all around the circle, seating the feeder tightly and squarely on its bevelled seat. Check the bolts holding the lips and other bolts that may require tightening. The beveled seat design is used primarily where a feeder is provided for the trunnion to trunnion liner connection, and the trunnion liner to feeder connection. When a feeder is not used these connecting joints are usually provided by a simple cylindrical or male and female joint.

If a spout feeder is to be used, it is generally supplied by the user, and should be mounted independently of the mill. The spout should project inside the feed trunnion liner, but must not touch the liner or spiral.

Ordinarily the feed box for a scoop tender is designed and supplied by the user. The feed box should be so constructed that it has at least 6 clearance on both sides and at the bottom of the scoop. This clearance is measured from the outside of the feed scoop.

The feed box may be constructed of 2 wood, but more often is made of 3/16 or plate steel reinforced with angles. In the larger size mills, the lower portion is sometimes made of concrete. Necessary openings should be provided for the original feed and the sand returns from the classifiers when in closed circuit.

A plate steel gear guard is furnished with the mill for safety in operation and to protect the gear and pinion from dirt or grit. As soon as the gear and pinion have been cleaned and coated with the proper lubricant, the gear guard should be assembled and set on its foundation.

Most Rod Mills are provided with a discharge housing mechanism mounted independently of the mill. This unit consists of the housing proper, plug door, plug shaft, arm, and various hinge pins and pivot and lock pins. The door mechanism is extra heavy throughout and is subject to adjustment as regard location. Place the housing proper on the foundation, level with steel shims and tighten the foundation bolts. The various parts may now be assembled to the housing proper and the door plug can be swung into place, securing it with the necessary lock pins.

After the mill has been completely assembled and aligned, the door mechanism centered and adjusted, and all clearances checked, the housing base can be grouted. The unit should be so located both vertically and horizontally so as to provide a uniform annular opening between the discharge plug door and the head liners.

In some cases because of space limitation, economy reasons, etc., the mill is not equipped with separate discharge housing. In such a case, the open end low discharge principal is accomplished by means of the same size opening through the discharge trunnion but with the plug door attached to lugs on the head liner segments or lugs on the discharge trunnion liner proper. In still other cases, it is sometimes effected by means of an arm holding the plug and mounted on a cross member which is attached to the bell of the discharge trunnion liner. In such cases as those, a light weight sheet steel discharge housing is supplied by the user to accommodate the local plant layout in conjunction with the discharge launder.

TRUNNION BEARING LUBRICATION. For the larger mills with trunnion bearings provided with oil seals, we recommend flood oil lubrication. This can be accomplished by a centralized system for two or more mills, or by an individual system for each mill. We recommend the individual system for each mill, except where six or more mills are involved, or when economy reasons may dictate otherwise.

In any event oil flow to each trunnion bearing should be between 3 to 5 gallons per minute. The oil should be adequately filtered and heaters may be used to maintain a temperature which will provide proper filtration and maintain the necessary viscosity for adequate flow. The lines leading from the filter to the bearing should be of copper tubing or pickled piping. The drain line leading from the bearings to the storage or sump tank should be of adequate size for proper flow, and they should be set at a minimum slope of per foot, perferably per foot. Avoid unnecessary elbows and fittings wherever possible. Avoid bends which create traps and which might accumulate impurities. All lines should be thoroughly cleaned and flushed with a solvent, and then blown free with air, before oil is added.

It is advisable to interlock the oil pump motor with the mill motor in such a way that the mill cannot be started until after the oil pump is operating. We recommend the use of a non-adjuslable valve at each bearing to prevent tampering.

When using the drip oil system it is advisable to place wool yarn or waste inside a canvas porous bag to prevent small pieces of the wool being drawn down into the trunnion journal. If brick grease is used, care should be taken in its selection with regard to the range of its effective temperature. In other words, it should be pointed out that brick grease is generally designed for a specific temperature range. Where the bearing temperature does not come up to the minimum temperature rating of the brick grease, the oil will not flow from it, and on the other hand if the temperature of the bearing exceeds the maximum temperature rating of the brick grease, the brick is subject to glazing; therefore, blinding off of the oil. This brick should be trimmed so that it rests freely on the trunnion journal, and does not hang up, or bind on the sides of the grease box.

When replacing the brick grease, remove the old grease completely. Due to the extended running time of brick grease, there is usually an accumulation of impurities and foreign matter on the top surface, which is detrimental to the bearing.

Where anti-friction bearings are supplied, they are adequately sealed for either grease or oil lubrication. If a flood system is used for the trunnion bearings and it is adequately filtered, it can then be used for pinion bearings with the same precautions taken as mentioned above, with a flow of to 1 gallons per minute to each bearing.

These lubricants can be applied by hand, but we highly recommend some type of spray system, whether it be automatic, semi-automatic or manually operated. It has been found that it is best to lubricate gears frequently with small quantities.

Start the lubrication system and run it for about ten minutes, adjusting the oil flow at each bearing. Check all of the bolts and nuts on the mill for tightness and remove all ladders, tools and other obstructions prior to starting the mill.

Before starting the mill, even though it is empty, we recommend that it be jogged one or two revolutions for a check as to clearance of the gear and its guard, splash rings, etc. The trunnion journal should also be checked for uniform oil film and for any evidence of foreign material which might manifest itself through the appearance of scratches on the journal. If there are any scratches, it is very possible that some foreign material such as weld splatter may have been drawn down into the bushing, and can be found imbedded there. These particles should be removed before proceeding further.

If everything is found to be satisfactory, then the mill should be run for ten to fifteen minutes, and stopped. The trunnion bearings should be checked for any undue temperature and the gear grease pattern can be observed for uniformity which would indicate correct alignment.

It should be noted that with an empty mill the reactions and operating characteristics of the bearings and gearing at this point are somewhat different than when operating with a ball or rod charge. Gear noises will be prominent and some vibration will occur due to no load and normal back-lash. Furthermore, it will be found that the mill will continue to rotate for some time after the power is shut off. Safety precautions should therefore he observed, and no work should be done on the mill until it has come to a complete stop.

We have now reached the point where a half ball or rod charge can be added, and the mill run for another six to eight hours, feeding approximately half the anticipated tonnage. The mill should now be stopped, end the gear grease pattern checked, and gear and pinion mesh corrected, if necessary, according to separate instructions.

The full charge of balls or rods can now be added, as well as the full amount of feed, and after a run of about four to six days, ALL BOLTS SHOULD AGAIN BE RETIGHTENED, and the gear and pinion checked again, and adjusted if necessary.

Where starting jacks are provided for the trunnion bearings of the larger sized mills, they should be filled with the same oil that is used for the lubrication of the trunnion bearings. Before starting the mill they should be pumped so as to insure having an oil film between the journal and the bushing.

When relining any part of the mill, clean away all sand from the parts to be relined before putting in the new liners. For the head liners and shell liners you may then proceed in the same manner used at the time of the initial assembly.

Before relining the grate type discharge head, it is advisable to refer to the assembly drawings and the parts list.Because of such limitations as the size of the manhole opening, and for various other reasons, it will be found that the center discharge liner and cone designs vary. The cone may be a separate piece or integral with either the trunnion liner, or the router discharge liner. Furthermore, it will be found in some mills that the center discharge liner is held by bolts through the discharge head, whereas in other cases it depends upon the clamping effect of grates to hold it in position. In any event, the primary thing to remember in assembling the discharge grate head parts is the fact that the grate should be first drawn up tightly towards the center discharge liner by adjusting the grate set screws located at the periphery of the discharge head. This adjustment should be carried out in progressive steps, alternating at about 180 if possible and in such a manner that, the center discharge liner does not become dislodged from its proper position at the center of the mill. These grate set screws should be adjusted with the side clamp bar bolts loosened. After the grates have been completely tightened with the set screws, check for correct and uniform position of each grate section. The side clamp bar bolts may now be lightened, again using an alternate process. This should result in the side clamp bars firmly bearing against the beveled sides of the grates. The side clamp bars should not hear against the lifter liners.

When new pan liners are installed, they should be grouted in position so as to prevent pulp race in the void space between the discharge head and the pan liner. Another good method of preventing this pulp race is the use of the sponge rubber which can be cemented in place.

After the mill is erected, in order to avoid overlooking both obvious and obscure installation details, we recommend the use of a check list. This is particularly recommended for multiple mill installations where it is difficult to control the different phases of installation for each and every mill. Such a check list can be modeled after the following:

No. 1 Connecting Bolts drawn tight. A. Head and Shell flange bolts. B. Gear Connecting, bolts. No. 2 Trunnion studs or bolts drawn up tight. No. 3 Trunnion liner and feeder connecting bolts or studs drawn up tight. No. 4 Feeder lip bolts tightened. No. 5 Liner bolts drawn up tight. No. 6 Gear. A. Concentric B. Backlash C. Runout D. Joint bolts drawn up tight. No. 7 Coupling and Drive alignment and lubrication. No. 8 Bearings and Gearing cleaned and lubricated. No. 9 Lubrication system in working order with automatic devices including alarms and interlocking systems.

We further recommend that during the first thirty to sixty days of operation, particular attention be given to bolt tightness, foundation settlement and condition of the grouting. We suggest any unusual occurrence be recorded so that should trouble develop later there may be a clue which would simplify diagnosing and rectifying the situation.

As a safety precaution, and in many cases in order to comply with local safety regulations, guards should be used to protect the operators and mechanics from contact with moving parts. However, these guards should not be of such a design that will prevent or hinder the close inspection of the vital parts. Frequent inspection should be made at regular intervals with particular attention being given to the condition of the wearing parts in the mill. In this way, you will be better able to anticipate your needs for liners and other parts in time to comply with the current delivery schedules.

When ordering repair or replacement parts for your mill, be sure to identify the parts with the number and description as shown on the repair parts list, and specify the hand and serial number of the mill.

By following the instructions outlined in this manual, mechanical malfunctions will be eliminated. However, inadvertent errors may occur even under, the most careful supervision. With this in mind, it is possible that some difficulties may arise. Whenever any abnormal mechanical reactions are found, invariably they can be attributed to causes which though sometimes obvious are often hidden. We sight herewith the most common problems, with their solutions.

Cause A GROUT DISINTEGRATION. Very often when the grouting is not up to specification the vibration from the mill tends to disintegrate the grouting. In most instances the disintegration starts between the sole plate and the top surface of the grouting near or at the vertical centerline of the mill. As this continues, the weight of the mill causes the sole plate and trunnion bearing base to bend with a resultant pinching action at the side of the bearing near the horizontal center line of the mill. This pinching will cut off and wipe the oil film from the journal and will manifest itself in the same manner as if the lubrication supply had been cut off. If the grout disintegration is limited to about . 050 and does not appear to be progressing further, the situation can be corrected by applying a corresponding amount of shimming between the trunnion bearing base and the sole plate near the centerline of the mill in such a fashion that the trunnion bearing base has been returned to its normal dimensional position. If, on the other hand, the grouting is in excess of . 050 and appears to be progressing further, it is advisable to shut down operations until the sole plate has been re grouted.

Cause B HIGH SPOT ON THE BUSHING. While all BallMill bushings are scraped in the shop to fit either a jig mandrel or the head proper to which it is to be fitted, nevertheless there is a certain amount of seasoning and dimensional change which goes on in the type of metals used. Therefore if high spots are found, the mill should be raised, the bushings removed and rescraped. Bluing may be used to assist in detecting high spots.

Cause C INSUFFICIENT OIL FLOW. Increase the oil supply if it is a flood oil system. If brick grease is used, it is possible that the particular grade of brick may not be applicable to the actual bearing temperature. Refer to the remarks in this manual under the paragraph entitled Lubrication.

Cause E EXCESSIVE RUBBING ON THE SIDE OF THE BUSHING. This comes about due to the improper setting of the bearings in the longitudinal plane. In some cases, particularly on dry grinding or hot clinker grinding mills, the expansion of the mills proper may account for this condition. In any event, it can be remedied by re-adjusting the bearing base on the sole plate longitudinally at the end opposite the drive.

There are many more lubricant suppliers, such as E. F. Houghton and Co. , or Lubriplate Division of Fiske Bros. Refining Co. In making your final selection of lubricants, you should consider the actual plant conditions as well as the standardization of lubricants. New and improved lubricants are being marketed, and we, therefore, suggest that you consult your local suppliers.

ball mill installation diagram

ball mill installation diagram

For each project scheme design, we will use professional knowledge to help you, carefully listen to your demands, respect your opinions, and use our professional teams and exert our greatest efforts to create a more suitable project scheme for you and realize the project investment value and profit more quickly.

This ball bearing is 17 mm and fits a variety of gardening power tools. The ball bearing has two contact rubber seals on each side and two non-contact metal shields on each end as well. Tip: if your tools needs only one seal or shield, then take off one of the shields or seals from this ball .

A mill is a device that breaks solid materials into smaller pieces by grinding, crushing, or cutting. Such comminution is an important unit operation in many processes. There are many different types of mills and many types of materials processed in them. Historically mills were powered by hand (e.g., via a hand crank), working animal (e.g ...

20/10/2016 A ball mill liner assembly and installation method thereof; the ball mill liner assembly comprises wear-resistant liners (1), installation modules (3) and self-fixing liners (2); the self-fixing liners are made of ductile materials such as carbon steel or low-carbon alloy steel; the wear-resistant liners are integrally made of ceramic material; self-fixing liners are installed between a ...

Tip: if your tools needs only one seal or shield, then take off one of the shields or seals from this ball bearing. Refer to the manual provided by the manufacturer for further installation instructions and a detailed diagram.

G SERIES HAMMER MILL INSTALLATION, OPERATION, AND MAINTENANCE MANUAL Prater Industries, Inc. 2 Sammons Court Bolingbrook, IL 60440 Phone 630-759-9595 Fax 630-759-6099 Prater Industries, Inc. Table of Contents Section 11.1 1.2 ...

Customized, fit-for-purpose mill parts and components that aim to improve the reliability of your machine. From a parts supplier to a full-service partner, Metso is here to support you, no matter the brand of your grinding mill.

The SAG mill was designed to treat 2,065 t h 1 of ore at a ball charge of 8% volume, total filling of 25% volume, and an operating mill speed of 74% of critical. The mill is fitted with 80 mm grates with total grate open area of 7.66 m 2 ( Hart et al., 2001 ).

This ball bearing is 17 mm and fits a variety of gardening power tools. The ball bearing has two contact rubber seals on each side and two non-contact metal shields on each end as well. Tip: if your tools needs only one seal or shield, then take off one of the shields or seals from this ball bearing.

24/4/2015 Ball mill consist of a hollow cylindrical shell rotating about its axis. Axis of the shell horizontal or at small angle to the horizontal It is partially filled with balls made up of Steel,Stainless steel or rubber Inner surface of the shell is lined with abrasion resistant

This ball bearing is 17 mm and fits a variety of gardening power tools. The ball bearing has two contact rubber seals on each side and two non-contact metal shields on each end as well. Tip: if your tools needs only one seal or shield, then take off one of the shields or seals from this ball bearing.

Ball Mill Instruction Manual (PDF) Ball Mill Diagram Sheet (PDF) The software to view and print Adobe Acrobat (PDF) is available for free from the Adobe website. Follow the provided icon link to download Acrobat Reader. 395-50 (220/440v, 3 phase, 60

Metallurgical ContentBall Mill Maintenance ManualOn Mill Installation and MaintenanceBall Mill Concrete FoundationsGrinding Mill FOUNDATIONGROUTINGBall Mill Sole Plate Am sure your Ball Mill is considered the finest possible grinding mill available. As such you will find it is designed and constructed according to heavy duty specifications. It is designed along sound engineering principles ...

Circuit 03 is composed of a vertical roller mill pre-grinder, feeding a two compartment ball mill . Chapter 4 provides a description of the clinker used based on the work index, and other . Grinding of clinker with additives is the final part of the cement production.

Ball Mill Design Parameters Size rated as diameter x length. Feed System One hopper feed Diameter 40 100 cm at 30 to 60 Top of feed hopper at least 1.5 meter above the center line of the mill. Feeder Single or double helical scoop feeder or a spout feeder

Ball Mill Instruction Manual (PDF) Ball Mill Diagram Sheet (PDF) The software to view and print Adobe Acrobat (PDF) is available for free from the Adobe website. Follow the provided icon link to download Acrobat Reader. 395-50 (220/440v, 3 phase, 60

Search in Metso Corporation catalogs and technical brochures on DirectIndustry and find the information you need in 1 click. *Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation ...

Installation for Machines with R-8 Spindle Taper If the machine was manufactured on or after January 1, 1983, the manufacturer has drilled and tapped two holes in the nose cap of the spindle to be used for mounting the guard (the two untapped holes serve to 1.

20/10/2016 A ball mill liner assembly and installation method thereof; the ball mill liner assembly comprises wear-resistant liners (1), installation modules (3) and self-fixing liners (2); the self-fixing liners are made of ductile materials such as carbon steel or low-carbon alloy steel; the wear-resistant liners are integrally made of ceramic material; self-fixing liners are installed .

G SERIES HAMMER MILL INSTALLATION, OPERATION, AND MAINTENANCE MANUAL Prater Industries, Inc. 2 Sammons Court Bolingbrook, IL 60440 Phone 630-759-9595 Fax 630-759-6099 Prater Industries, Inc. Table of Contents Section 11.1 1.2 ...

Ball Mill Design A survey of Australian processing plants revealed a maximum ball mill diameter of 5.24 meters and length of 8.84 meters (Morrell, 1996). Autogenous mills range up to 12 meters in diameter. The length-to-diameter ratios in the previous table are for

Every mining operation has a unique grinding process. Variable needs require versatile grinding equipment. Metso offers flexible autogenous (AG) mills, semi-autogenous (SAG) mills, ball and pebble mills, as well as stirred mills to fit your needs.

Programming the Mill Automatic Parts Loader (APL) Set Tool Length Offsets Quickly The Automatic Tool Presetter for your Haas CNC Lathe HaasCast - Episode 01 with Mark, Frank, and Andrew - Haas Automation CNC Machine Tool Podcast Lathe - Faster

This ball bearing is 17 mm and fits a variety of gardening power tools. The ball bearing has two contact rubber seals on each side and two non-contact metal shields on each end as well. Tip: if your tools needs only one seal or shield, then take off one of the shields or seals from this ball bearing.

Grinding mill process design Choosing an appropriate grinding circuit configuration depends on your ore characteristics and mine plan. Outotec has extensive knowledge of comminution technologies and processes to ensure we provide the optimal solution for your

Metallurgical ContentBall Mill Capacity VS Rod Mill CapacityWorking Principle & OperationRod Mill Capacity TableBall VS Rod Mill ConversionTypes of Mill DischargeBall Mill Trunnion and Mill Grate DischargePeripheral Grinding Mill DischargeLoad Capacity of Trunnion BearingsBall Mill & Rod Mill LinersGrinding Mill GearsGrinding Mill DrivesBall Mill Grinding CircuitBall Mill .

Search in Bhler Group catalogs and technical brochures on DirectIndustry and find the information you need in 1 click. *Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options.

Installation, Maintenance and Operating instructions Actuators Analog Positioners & Limit Switches Application Based Products Ball Valves Butterfly Valves Finetrol Valves, Control Valves Globe Valves Rotary Globe Valves Segment Valves Smart Products

The mill product can either be finished size ready for processing, or an intermediate size ready for final grinding in a rod mill, ball mill or pebble mill. AG/SAG mills can accomplish the same size reduction work as two or three stages of crushing and screening, a rod mill, and some or all of the work of a ball mill.

The mill product can either be finished size ready for processing, or an intermediate size ready for final grinding in a rod mill, ball mill or pebble mill. AG/SAG mills can accomplish the same size reduction work as two or three stages of crushing and screening, a rod mill, and some or all of the work of a ball mill.

Related News
  1. ball mill 3d
  2. trunnion in ball mill
  3. wet ball mill applixinhaiion
  4. compact structure pf1246 ball mill
  5. bio ceramic ball for kids sand
  6. singapore city efficient large ilmenite milling production line sell at a loss
  7. cost of grinding in gold production stone crusher for sale
  8. new quartz mineral processing production line in tokyo
  9. ball bearing
  10. monrovia high quality small kaolin ceramic ball mill manufacturer
  11. rock crushing machine supplier in dubai
  12. spare part jaw crusher chattisgarh
  13. fri gold mining dredging equipment for sale
  14. used rotary kilns
  15. 10 x 16 jaw crusher
  16. high frequency screen geeks
  17. singapore cat mining equipment
  18. bucket elevator manufacturers in usa
  19. high quality portable chrome ore raymond mill price in zimbabwe
  20. mineral processing production line clip